資料載入中.....
|
請使用永久網址來引用或連結此文件:
https://irlib.pccu.edu.tw/handle/987654321/35964
|
題名: | Nuclear Power Plant Construction Scheduling Problem with Time Restrictions: A Particle Swarm Optimization Approach |
作者: | Chen, SK (Chen, Shang-Kuan) Ti, YW (Ti, Yen-Wu) Tsai, KY (Tsai, Kuo-Yu) |
貢獻者: | 應數系 |
關鍵詞: | VARIABLE NEIGHBORHOOD SEARCH PROJECTS ALGORITHM MODEL |
日期: | 2016 |
上傳時間: | 2017-04-18 09:41:46 (UTC+8) |
摘要: | In nuclear power plant construction scheduling, a project is generally defined by its dependent preparation time, the time required for construction, and its reactor installation time. The issues of multiple construction teams and multiple reactor installation teams are considered. In this paper, a hierarchical particle swarm optimization algorithm is proposed to solve the nuclear power plant construction scheduling problem and minimize the occurrence of projects failing to achieve deliverables within applicable due times and deadlines. |
關聯: | SCIENCE AND TECHNOLOGY OF NUCLEAR INSTALLATIONS 文獻號碼: 2150692 |
顯示於類別: | [應數系] 期刊論文
|
文件中的檔案:
檔案 |
描述 |
大小 | 格式 | 瀏覽次數 |
index.html | | 0Kb | HTML | 392 | 檢視/開啟 |
|
在CCUR中所有的資料項目都受到原著作權保護.
|