文化大學機構典藏 CCUR:Item 987654321/35964
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 47184/51050 (92%)
Visitors : 13973810      Online Users : 285
RC Version 6.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version


    Please use this identifier to cite or link to this item: https://irlib.pccu.edu.tw/handle/987654321/35964


    Title: Nuclear Power Plant Construction Scheduling Problem with Time Restrictions: A Particle Swarm Optimization Approach
    Authors: Chen, SK (Chen, Shang-Kuan)
    Ti, YW (Ti, Yen-Wu)
    Tsai, KY (Tsai, Kuo-Yu)
    Contributors: 應數系
    Keywords: VARIABLE NEIGHBORHOOD SEARCH
    PROJECTS
    ALGORITHM
    MODEL
    Date: 2016
    Issue Date: 2017-04-18 09:41:46 (UTC+8)
    Abstract: In nuclear power plant construction scheduling, a project is generally defined by its dependent preparation time, the time required for construction, and its reactor installation time. The issues of multiple construction teams and multiple reactor installation teams are considered. In this paper, a hierarchical particle swarm optimization algorithm is proposed to solve the nuclear power plant construction scheduling problem and minimize the occurrence of projects failing to achieve deliverables within applicable due times and deadlines.
    Relation: SCIENCE AND TECHNOLOGY OF NUCLEAR INSTALLATIONS 文獻號碼: 2150692
    Appears in Collections:[Department of Applied Mathematics] journal articles

    Files in This Item:

    File Description SizeFormat
    index.html0KbHTML393View/Open


    All items in CCUR are protected by copyright, with all rights reserved.


    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - Feedback