文化大學機構典藏 CCUR:Item 987654321/28856
English  |  正體中文  |  简体中文  |  全文筆數/總筆數 : 46962/50828 (92%)
造訪人次 : 12467122      線上人數 : 622
RC Version 6.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜尋範圍 查詢小技巧:
  • 您可在西文檢索詞彙前後加上"雙引號",以獲取較精準的檢索結果
  • 若欲以作者姓名搜尋,建議至進階搜尋限定作者欄位,可獲得較完整資料
  • 進階搜尋
    主頁登入上傳說明關於CCUR管理 到手機版


    請使用永久網址來引用或連結此文件: https://irlib.pccu.edu.tw/handle/987654321/28856


    題名: 地下連續壁施工階段之工地管理-以文化大學再興大樓爲例
    Execution Management for Construction Using Underground Diaphragm Wall-A Case Study with Tsay Shing Building of Chinese Culture University
    作者: 蘇鴻奇
    林文斌
    蔡述彰
    貢獻者: 華岡工程學報
    關鍵詞: underground diaphragm wall
    earth retaining
    scheme of execution
    execution scheme drawing
    日期: 1992-07
    上傳時間: 2014-11-04 17:47:39 (UTC+8)
    摘要: 地下連續壁既可做爲地下開挖時之擋土設備,又可做爲地下室完成後之永久壁體,是目前台灣廣泛採用的工法之一。本工法自國外引進至今也已逾二十年,但施工水準多年來卻一直未獲改善,施工中工程災害的發生,施工後之品質低下……等等缺失時有所聞。究其原因以人爲因素居多,也就是事前的施工計劃不夠週祥,施工中工地管理疏鬆所造成。
    本研究以中國文化大學再興大樓地下連續壁工程爲主要調查對象,希望藉由此一案例的研究,提供施工者在未來從事相同工程時,對施工計劃的擬定、工地管理、品質控制、公害防止等事項,能夠加以重視。本研究之主要內容包括以下三部分:
    1.檢討工地既行之狀況:
    針對工地現場之作業環境,現存問題做一檢討。
    2.改善方案的提出:
    根據以上發現的缺失,提出品質控制、公害防止等改善計劃。
    重新繪製施工計劃圖:
    本工程雖已由施工單位繪製施工計劃圖,但內容未盡完備。因此配合各項影響因素及現場狀況,重繪完備之施工計劃圖。
    The Underground Diaphragm Wall, with its earth retaining capability in cutting and its capacity as the permanent wall after construction, is popular in Taiwan. Although it has been introduced into this country for more than 20 years, its engeering plagues of calamity damage, poor construction quality and others remain challenges. These problem are largely ascribable to insufficient scheme of execution and poor execution, execution management, quality control and pollution control for future use.
    This study shall fall into 3 categories
    1. Investigation of the present field situation the field work environment and the present problems will studied.
    2. proposal of improvements: the problems found in the above investigation will be tackled and plans to improve the quality control and pollution control will be presented.
    3. Redrawing Execution Scheme:
    Since the Execution Scheme Drawing provided by the builder is anything but complete, it will be redrawed with the consideration of various factors and the field environment.
    關聯: 華岡工程學報 ; 6 期 (1992 / 07 / 01) , P161 - 179
    顯示於類別:[工學院] 學報-華岡工程學報

    文件中的檔案:

    檔案 描述 大小格式瀏覽次數
    index.html0KbHTML162檢視/開啟


    在CCUR中所有的資料項目都受到原著作權保護.


    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 回饋